SF News

< Back to News

Provincetown Marina Takes Delivery of Concrete floating breakwaters and Docks. Installation underway for Spring opening

May 16, 2016

The ship HHL Richards Bay  off loaded  the new concrete Floating Breakwaters and Docks in late April,  into the water  just out side the Provincetown harbor.     The Type 500 floating breakwaters, 1240 and 1250 high freeboard concrete floating docks, will be used in the first phase of the new Provincetown Marina.   This modern marina  when complete will accommodate  the full range of vessels from cruising   sailors and power boats to super yachts.

The second shipment of Breakwaters and Docks is being manufactured  and slated to ship late summer 2016.   Additional 1250s 1260s, 500s and the type 600 floating  breakwaters ( 20′ wide  7.88′ tall) will complete  the marina.

Visit the marina web site:  ptownmarina.com

IMG_4646

IMG_4668

DSC03941

DSC03938